Australia & New Zealand (03) 9540 5100

HST18 Suspended Centre Span Bridge

The HST18 Suspended Centre Span Bridge training equipment is designed for educational institutes to investigate different forces acting on a bridge with a central section suspended by the two outer cantilever sections of the bridge. The training equipment enables students to get an understanding of the mechanical properties of a centre span bridge and reaction forces at the support via three loads. The entire training equipment kit is available with tools and an instruction manual to perform the different laws of reaction influence lines, reactions and rolling loads.  

Experimental capabilities:

  • Production of influence lines for all six reactions
  • Use of the influence lines for a tandem rolling load
Specifications and resources Bridge total length: 1226mm Centre span length: 270mm Side Bridge Section length: 478 Load cell: 0...500N   Weights & Dimensions Weight: 20 kg Length: 1300mm Width: 150mm Height: 400mm   Operational Conditions Storage temperature: -10°C to +70°C Operating temperature range: +10°C to +50°C Operating relative humidity range: 0 to 95%, non-condensing  
Enquire Now
X